This building was a pre-engineered modified structure. DRS added masonry walls to the facility in the bay areas to better manage the hard wear and tear on the building. There are 6 vehicle bays for the maintenance vehicles. Next to the bays is the maintenance shop, which includes a welding area, and wood and metal shop. New office space, locker rooms and kitchenette for the maintenance personnel were developed. A mezzanine level is used to house the heat recovery mechanical system. There is also storage space available on the mezzanine level which is made flexible with removable hand rails. Finally, there is a receiving dock, temporary storage area and additional permanent storage areas. |